Skip to main content
BC HOUSING #52603 · BC HYDRO ES54 CIVIL · 2-5-10 WARRANTY · OPEN-BOOK CCDC 5B
BC REALTOR® & AIBC ARCHITECT PARTNER DESK • BCFSA RULE 5-11 COMPLIANT

De-Risk Difficult Lots Before Subject Removal. Keep Schematic Designs On-Budget.

Drop an active MLS® number, PID, or schematic site plan directly to Principal Superintendent Wayne Stevenson (#52603). Within 48 business hours, your buyer or studio receives a written bedrock, BC Hydro ES54 transformer, and Class-C $/SF constructability brief—backed by our compliant 0.50% Managing-Brokerage CCDC 5B referral.

✓ RESA s. 6–7 Managing Brokerage Only ✓ Written Rule 5-11 DOR Included
30-Second Pre-Offer MLS® / PID Dropzone 48-HR TURNAROUND
BC REALTOR® & AIBC ARCHITECT PRE-OFFER DESK · BCFSA RULE 5-11

48-Hour Pre-Offer Lot Constructability + Compliant 0.50% Managing-Brokerage Referral.

Protect your buyer before subject removal on steep granite, riparian, or Bill 44 SSMUH parcels—and receive a transparent, fully disclosed 0.50% CCDC 5B build referral remitted strictly to your licensed Managing Brokerage under BCFSA Rule 5-11 and RESA s. 6–7.

✓ 48-Hour Pre-Offer Subject-Removal Dossier: Bedrock/shoring exposure, BC Hydro ES54 400A–800A PMT clearance, and Class-C $/SF pro-forma before subjects come off.
✓ 100% Managing-Brokerage & Written DOR Compliance: Paid directly to the licensed Managing Brokerage (never to an individual or unlicensed party) with written Disclosure of Remuneration signed by the client prior to CCDC 5B execution.
✓ AIBC Architect & EGBC Early Value-Engineering Track: Schematic cantilever, glazing, and mechanical cost checks that preserve design intent without mid-tender redesigns.
Submit MLS® / PID for 48-Hr Review →
MANAGING-BROKERAGE REFERRAL CALCULATOR (0.50%) RESA s. 6–7 COMPLIANT
Total Gross Managing-Brokerage Referral (0.50% + GST)
$22,500 CAD
Paid via corporate EFT/trust cheque strictly to Managing Brokerage upon verified build milestones.
Tranche 1 (50% · Building Permit & Mobilization)
$11,250 CAD
Tranche 2 (50% · Structural Lockup Gate)
$11,250 CAD
INSIDE THE 48-HOUR PRE-OFFER & SCHEMATIC DOSSIER

Inspect What Your Client or Design Studio Receives Within 48 Hours.

Subgrade Rock, Micropile & Creek Setback Exposure

Before your buyer removes subjects on a steep British Properties, Whistler, or North Shore bluff, we map visible granodiorite outcrops, crane reach, temporary shotcrete shoring, and 15m riparian creek setbacks—quantifying civil variance before deposit lock-in.

  • Line-drilling / hydraulic rock-splitting vs controlled blasting allowance
  • Socketed micropile & post-tensioned tie-back anchor exposure
  • Flood Construction Level (FCL) & pumped storm attenuation flags
CANTILEVERED ENVELOPE SOCKETED GRANITE MICROPILES (300 kPa)

BC Hydro ES54 400A–800A & CEC Rule 26-242 PMT Check

On-site Pad-Mounted Transformers (PMTs) routinely catch buyers and architects off guard—consuming prime front-yard setback area due to mandatory 3.0m hot-stick operational clearance. As a registered ES54 civil contractor, we flag PMT spatial geometry in 48 hours.

  • DB2 PVC duct trench routing (≥900mm boulevard / ≥1050mm driveway)
  • CEC Rule 26-242 3.0m front & window/combustible wall clearances
  • Self-performed ES54 civil cost vs third-party utility broker delays
ES54 SPATIAL CLEARANCE MATRIX
• PMT Front Hot-Stick Zone: 3.00m Unobstructed
• Boulevard Duct Cover: ≥ 900mm DB2 PVC
• Vehicular Crossing Cover: ≥ 1,050mm Concrete/DB2
• Hydro-Vac Tolerance Zone: 1,500–2,200 PSI (≤1.0m)

Bill 44 SSMUH (3–6 Units) & Vancouver R1-1 Feasibility

Evaluate whether a teardown parcel performs better as a signature custom home or a 4–6 unit Bill 44 / 1.0 FSR R1-1 multiplex—factoring in 2" domestic water main upgrades, NFPA 13D/13R sprinklers, storm detention tanks, and Part 4 lateral shear walls.

Pre-Offer Multiplex Checkpoints: 1. Transit-Oriented Area (TOA) vs 3–4–6 unit SSMUH tier
2. Frontage & lane access for multi-gang 400A/600A metering
3. Net salable strata SF vs Open-Book CCDC 5B hard build cost

AIBC Studio Schematic Cost & Detail Calibration

Nothing frustrates an architectural studio or client more than tendering a completed permit set only to discover bids sit 35% above budget. Under pre-construction CCDC 5B advisory, we price structural steel cantilevers, board-formed concrete lifts, and glazing packages live during schematic design.

Architectural Collaboration Deliverables: • Live 3-bid sub-trade budget checks at SD, DD, and 75% BP
• Thermal-bridge & Step Code 5 / EL-4 assembly coordination
• Shared 13-sheet IFC digital portal for CRP & Schedule B reviews
DIRECT PRINCIPAL CONSULTATION DESK · 48-HR SLA

Submit an MLS® Parcel, Schematic Set, or Brokerage DOR Request.

Reviewed directly by Principal & Heavy-Civil Superintendent Wayne Stevenson (#52603) at 1 Watts Point Road, Squamish—never routed to junior sales brokers.

HEADQUARTERS & DIRECT DISPATCH
Wayne Stevenson — BC Housing #52603
Address: 1 Watts Point Road, Squamish, BC V8B 0B1
Direct Line: (604) 848-9688
Credentials: BC Housing #52603 • BC Hydro ES54 Civil • WorkSafeBC #201703481 • Mandatory 2-5-10 Warranty
Scroll to Top