Hydronic Radiant Floor Manifolds, Heat Pumps & ERV Engineering
DIRECT SUPERINTENDENT ENGINEERING SPECIFICATION • WAYNE STEVENSON (#52603)
High-performance BCBC 2024 mechanical rooms pair oxygen-barrier PEX-a hydronic radiant loops (pressure-tested to 100 PSI prior to slab/gypcrete pour) driven by cold-climate air-to-water heat pumps with dedicated acoustically attenuated ERV/HRV balanced ventilation—commission-tested to TECA standards without cross-suite recirculation.
BC Housing Licensed Builder #52603 • BC Hydro ES54 Civil
Read Companion Technical Blueprint →
DIRECT PRINCIPAL CONSULTATION DESK · 48-HR SLA
Request Your 48-Hour Lot & Constructability Dossier.
Reviewed directly by Principal & Heavy-Civil Superintendent Wayne Stevenson (#52603) at 1 Watts Point Road, Squamish—never routed to junior sales brokers.
HEADQUARTERS & DIRECT DISPATCH
Wayne Stevenson — BC Housing #52603
Address: 1 Watts Point Road, Squamish, BC V8B 0B1
Direct Line: (604) 848-9688
Credentials: BC Housing #52603 • BC Hydro ES54 Civil • WorkSafeBC #201703481 • Mandatory 2-5-10 Warranty
Direct Line: (604) 848-9688
Credentials: BC Housing #52603 • BC Hydro ES54 Civil • WorkSafeBC #201703481 • Mandatory 2-5-10 Warranty